Sector guide: Construction, Engineering & Building Materials
20,000+ projects shown, awards fell 48.5%: why no contract for you?
Announced projects are huge, but awards slowed in 2025. Winners hold the right classification and enough cash to survive the payment cycle.
- 365000 firmsContracting firms, end of 2025
- 4.4 m workersContracting sector workforce
- 48.5 %Drop in awards, 2025
- 3 trn SARProjects on show, not tenders
In short
The one-minute summary
- Firms grew 29.6% in one year, and 85% are micro. Competition for small contracts is fierce.
- Award value in 2025 fell by about half as giga-projects slipped. Do not build your plan on one contract.
- Classification via Balady is required for any government project subject to it. Your grade sets the size you can bid on.
- Cash flow kills contractors before losses do. Price in the payment cycle, guarantees and penalties before you bid.
- 30% Saudization for firms with 5+ workers in engineering professions since June 2026, and the Building Code makes offices liable for design and supervision.
Numbers
Construction, Engineering & Building Materials in numbers
All the numbers (12)
- 2812024
- 3652025
Opportunities
Where the openings are now
A 3 trn SAR project pipeline on show
The Future Projects Forum showed over 20k projects from 214 entities; these are plans, not open tenders. Learn the entities and their tender plans early.
Unawarded project pipeline
The GCC unawarded pipeline reached 3.2 trn USD, with Saudi Arabia the largest share. Awards are delayed, not cancelled.
Operations and maintenance
Updated classification added O&M and services fields: recurring contracts less exposed to new-project delays.
Direct purchase under the new law
The new law (effective date unverified) raises direct purchase to SAR 1m; read its text before building a plan on quick small contracts.
Building code compliance
Mandatory code compliance in design and supervision creates steady demand for engineering offices and inspection.
Local materials
Cement sales rose 7% in October 2025 over October 2024 despite the drop in award value (one month only), and local content favors national products.
Deal path
How this sector buys
- 01
Entity plan and budget
The project enters the annual budget and is often shown at project forums before tendering.
- 02
Etimad registration
A valid CR and certificates are required to view government tenders, buy documents and bid.
- 03
Classification check
Classification field and grade must match the project, or the bid is rejected.
- 04
Documents, site visit and queries
Study the scope and drawings, visit the site, and send questions within the window.
- 05
Technical then financial evaluation
Technical offer first, then financial for qualified bidders, with local content weighted.
- 06
Award, bond and contract
Performance bond, then contract signing and the payment claims schedule.
- 07
Prequalification with the main contractor
On large projects, subcontractors go through separate prequalification with the main contractor or owner.
Before you invest
What worries you before you start?
Questions everyone considering this business asks, with short answers.
I finish a phase and wait months for the payment
Late payment is an old problem; in 2018 about half of contractors were estimated to be late on wages. The new law bars an entity from new awards while dues are unpaid, but its effective date is unverified. Hold cash for months; 6 months in the calculator is SAR 720,000.
50%Firms late on worker wages, 2018 (not payment claims)
Giga-projects slowed. Is the boom over?
Saudi awards fell 48.5% in 2025 per MEED Projects as giga-projects slipped. Spread your portfolio across government, private, and O&M work instead of one project.
48.5%Drop in award value, 2025
My classification is low and blocks me from bidding
Article 3 of the Contractor Classification Law bars accepting a bid from a firm without classification in the project's field and grade. Start with contracts at your grade, document every completed project, and use permitted joint ventures with a higher-grade partner.
Competition is now on lowest price only
Firms jumped 29.6% in one year, mostly micro. Win by specializing: specialized construction, maintenance or a technical field, with a technical offer that moves evaluation beyond price.
29.6%Growth in number of firms, 2025
Delay penalties eat the profit
The new law cuts the delay penalty cap to 15% outside supply contracts, but its effective date is unverified; read its text and regulations before pricing. Document every owner-caused delay in writing and request a formal extension on time.
15%Delay penalty cap in the new law (effective date unverified)
Engineering Saudization will raise office costs
30% Saudization in engineering professions since 30 June 2026 for firms with 5+ workers in these professions. Plan hiring early and price it into long contracts.
30%Engineering Saudization
I worry about building code violations on my project
A violation starts with a notice, then a minimum fine, then a work stoppage if not corrected, and the violator is liable (per the amended violations regulation; check its latest changes). Have the supervising office document each phase before moving on.
I am a subcontractor and the main contractor delays my payments
When the owner pays late, the main contractor pays late, then you. Ask for an advance and a claims schedule tied to progress; if the main contractor refuses, ask for a clause fixing payment days after it receives its own payment, and price in the cost of financing delays. Never sign without a clear delay clause.
Local content favors locally manufacturing competitors
Local content carries weight in the financial evaluation, and local small firms get a 10% price preference. Use local suppliers and document your share before bidding.
10%Price preference for small firms
Costs many people forget
- Performance bondTies up the bank credit line for the whole projectShare of contract value
- Late payment claimsWages and materials funded out of pocketCash frozen for months
- Delay penaltiesOutside supply contracts, effective date unverified; read the penalty clause in your contractUp to 15% of contract under the new law
- Steel and cement price swingsFixed-price contracts rarely cover increasesChanges during the contract term
- Preparing losing bidsTender documents, pricing and site visits with no awardEngineering hours per bid
- Saudization costs30% in engineering professionsSaudi engineer salaries
Rules
Licences and rules before you sell
Rules and decisions (6)
- 2021
Contractor Classification Law
No government entity accepts a bid on a classified project except from a contractor classified in its field and grade; joint ventures allowed with conditions.
- 2026
Updated classification process via Balady
Fully automated application and assessment, with new fields including O&M, telecom, cybersecurity and real estate development.
- 2026
New Government Tenders and Procurement Law
Direct purchase up to SAR 1m, delay penalty up to 15%, and no new award while dues are unpaid; effective date unverified.
Check with the official authority before acting - 2025
Saudi Building Code Enforcement Law
Code compliance in design, execution and supervision; violations start with a notice, then a fine, then a work stoppage.
Check with the official authority before acting - 2026
30% engineering Saudization
Applies since 30 June 2026 to private firms with 5+ workers in engineering professions.
- 2020
Local content and small firm preference
A 10% price preference for local small firms, and weight for local content in financial bid evaluation.
Licences (6)
- Ministry of Commerce
CR with a contracting activity
Activity matching the field you will be classified and bid in
Check with the official authority before acting - Ministry of Municipalities and Housing (Balady)
Contractor classification certificate
Financial, technical and experience assessment; the certificate is printed online once approved
- Saudi Contractors Authority
Saudi Contractors Authority membership
Firm membership, training and qualification services, and project forums
Check with the official authority before acting - Saudi Council of Engineers
Professional accreditation for engineers
Required for engineers and engineering offices to practice
Check with the official authority before acting - Ministry of Municipalities and Housing
Engineering office license
For design, supervision and issuing approved drawings
Check with the official authority before acting - Ministry of Finance
Etimad registration
To view government tenders, buy documents and submit bids
Check with the official authority before acting
Entry requirements for suppliers (7)
Classification certificate
In a field and grade that fit the project, updated after each completed project
Audited financial statements
The basis for financial capacity in classification
Documented experience record
Number, type and value of past projects feed the grade
Engineer accreditation
Engineers accredited by the Saudi Council of Engineers for offices and supervision
Saudization ratio
30% in engineering professions and valid firm certificates
Etimad account
For government tenders, with valid Zakat and GOSI certificates
If you are a new firm
Classification needs audited financials and an experience record; start with private and residential contracts, and document your projects before forming a joint venture with a higher grade
Seasons
When to sell, when to prepare
- High
December–January
Government budget approved and the year's tenders begin
Start 8 weeks beforeRenew classification and certificates before the fiscal year starts
- High
Q1
Project forums, building exhibitions and entity plan announcements (check their announced dates)
Start 6 weeks beforeTarget entity list and an updated portfolio
- Quiet
June–September
The midday outdoor work ban slows productivity (check the ban dates)
Start 6 weeks beforeSchedule early shifts and price in the heat impact
- Quiet
Ramadan
Shorter hours and slower approvals and reviews
Start 4 weeks beforeClose payment claims and approvals before the month
- High
Q4
Fiscal year-end pressure on claims and handovers
Start 6 weeks beforeHand over phases early to catch this year's payment
- Quiet
Eid al-Adha holiday
Administrative pause at project owners and delayed approvals
Start 3 weeks beforeSubmit claims two weeks before the holiday
Regions
Where demand concentrates in the Kingdom
Share of contracting firms, 2025 (%)Lower ← → Higher
Regions worth starting in
- 1RiyadhA third of firms and 45% of the workforce, and home to most project owners.26.7% of population
- 2EasternNearly a quarter of the workforce; industrial and energy projects need specialist contractors.15.9% of population
- 3MakkahOver 15% of firms, the second-largest share after Riyadh.24.9% of population
- 4Qassim11.07% of firms.4.2% of population
Indicators for all 13 regions
| Region | Population (2022) | Of population | Of delivery orders | Of commercial registers | Share of contracting firms, 2025 (%) |
|---|---|---|---|---|---|
| Riyadh | 8,591,748 | 26.7% | 44.7% | 34.7% | 33.0 |
| Makkah | 8,021,463 | 24.9% | 22.4% | 20.7% | – |
| Eastern | 5,125,254 | 15.9% | 15.5% | 15.7% | 13.6 |
| Madinah | 2,137,983 | 6.6% | 4.5% | 4.9% | – |
| Asir | 2,024,285 | 6.3% | 3.4% | 5% | – |
| Jazan | 1,404,997 | 4.4% | 1.6% | – | – |
| Qassim | 1,336,179 | 4.2% | 2.8% | 5.3% | 11.1 |
| Tabuk | 886,036 | 2.8% | 1.8% | – | – |
| Hail | 746,406 | 2.3% | 1.6% | – | – |
| Al Jawf | 595,822 | 1.9% | 0.7% | – | – |
| Najran | 592,300 | 1.8% | 0.6% | – | – |
| Northern Borders | 373,577 | 1.2% | 0.5% | – | – |
| Al Bahah | 339,174 | 1.1% | 0.2% | – | – |
Population from the 2022 GASTAT census, delivery orders from the Transport General Authority for Q1 2025, registers from the Ministry of Commerce bulletin for Q2 2026.
Model and competition
Which shape fits you, and who do you compete with?
Possible business models
Small general contractor
Fits: A new firm starting with residential and private contracts, then raising its grade
Pros
- Faster entry
- Diverse clients
Challenges
- Fierce price competition
- Thin margin
Capital: Medium: working capital matters more than equipment
Specialist subcontractor
Fits: Experts in a field such as MEP, insulation or facades
Pros
- Demand from large contractors
- Technical edge
Challenges
- Payments depend on the main contractor
- Weak negotiating power
Capital: Medium: equipment and specialist technicians
Engineering office
Fits: Accredited engineers for design, supervision and code compliance
Pros
- Lower capital
- Steady demand from the code
Challenges
- 30% Saudization
- Professional liability
Capital: Low to medium
Building materials supplier
Fits: A distributor or factory selling to contractors and projects
Pros
- Repeat demand
- Local product preference
Challenges
- Long credit terms
- Price volatility
Capital: High: inventory and customer credit
Who you compete with
| Type | Examples | Note |
|---|---|---|
| Large classified contractors | Well-known examples: Nesma, Alkhorayef | Usually awarded large projects and subcontract part of the work |
| Foreign firms and consortia | International consortia on giga-projects | Need local partners for local content and subcontracting |
| Large engineering offices | Well-known examples: Dar Al-Handasah, Khatib & Alami | Well-known design and supervision offices on large projects |
| Micro firms | About 85% of sector firms | Compete on price for small residential contracts |
Where a newcomer can win
- A niche specialty the main contractor needs but lacks in-house
- New classification fields: O&M and services
- A delivery record documented with photos and dates that convinces evaluation committees
- High local content with documented local suppliers
Sales plan
Your first 90 days of selling
Setup
Weeks 1–4
- If you have a classification, review its field and grade; if you are new, prepare audited financials and an experience record
- Prepare a portfolio with figures and photos
- Register on Etimad and target entities' vendor portals
- Pick 10 target entities or main contractors
Launch
Weeks 5–8
- Bid on 3–5 tenders at your size
- Request prequalification with main contractors
- Post two completed projects on LinkedIn
- Attend a forum or exhibition with pre-booked meetings
Growth
Weeks 9–13
- Analyze why each bid was lost
- Form a joint venture for a higher-grade project once you have documented completed projects
- Add a maintenance contract for a past client
- Track cash flow weekly
Channels and the role of each (6)
| Channel | Role | Why | Common mistake |
|---|---|---|---|
| Etimad platform | Demand capture | All government tenders go through it | Bidding outside your classification grade or field |
| Main contractor vendor lists | Demand capture | Subcontracts on large projects start from the list | An incomplete or outdated prequalification file |
| LinkedIn and project content | Demand creation | Procurement and project managers look for contractors there | Project photos with no figures or client names |
| Building forums and exhibitions | Demand creation | Meet project owners before tendering | Attending with no pre-booked meetings |
| Google search and a services page | Demand capture | Villa owners and investors search for contractors and offices | A generic page with no classification or projects |
| Post-handover relationship | Loyalty | Maintenance and the same owner's expansions are the cheapest contract | Disappearing after the last payment claim |
The KPIs to track (5)
| KPI | Formula | What to watch |
|---|---|---|
| Bid win rate | Bids awarded ÷ bids submitted | A steady decline means you target the wrong tenders |
| Days to collect a payment claim | Payment date − approval date | The number that decides your survival |
| Actual project margin | (Value − actual cost) ÷ value | Compare it with the priced margin after each phase |
| Qualified leads per month | Tenders and requests matching your classification | A pipeline under 3 months is a risk |
| Local content ratio | Local spend ÷ total cost | Raises your rank in financial evaluation |
SWOT
SWOT for this business in Saudi Arabia
SStrengths
- Large, long-term announced projects
- Organized government spending through one platform
- Clear classification that rewards experience
WWeaknesses
- Weak cash flow at small firms
- Heavy reliance on expatriate labor
- Thin margins in general contracts
OOpportunities
- New O&M fields
- Higher direct-purchase cap (once the new law takes effect)
- Demand for building code compliance
- Local content preference
TThreats
- Giga-project delays and falling awards
- Late payments
- Material price volatility
- A surge in small competitors
Ad ideas
Ad lines to start with
A classified contractor with a documented on-time delivery record
An engineering office that prepares your drawings to the Saudi Building Code from the start
Local building materials delivered to site that support your local content
From the market
Practical tips for this business
- Do not quote before pricing guarantees, the payment claims gap and its financing cost.
- Document each completed project right away with figures and certificates. That is what raises your grade.
- Enter large projects as a specialist subcontractor, with a clear payment clause and the cost of late payment priced in.
- Put a clear clause in the contract for delays caused by the owner and main contractor.
- Look for O&M contracts. Their income recurs when new projects slow down.
Free files
Ready files for your project
Each file downloads on its own in Takteek branding, with this guide’s data and your calculator numbers, and a copy reaches your inbox.
- DOCX
SWOT analysis
A ready analysis with room for your own points.
- DOCX
Marketing plan
Goals, channels, seasons, budget and KPIs.
- DOCX
Marketing strategy
Audience, positioning, messages and channel mix.
- XLSX
90-day plan tracker
Tasks by week with owner and status.
- XLSX
Competitor analysis
A comparison sheet ready to fill.
- XLSX
Season calendar
Seasons and when to prepare for each.
- PDF
Licences and rules checklist
A list to check before launch.
- XLSX
Tender log and contract pipeline
Update it weekly. Win rate and loss reasons decide where you bid next.
Questions owners ask
How do I get a contracting company classified in Saudi Arabia?
Through Balady: apply online, and your financial and technical capacity, past experience and institutional capability are assessed. The classification certificate is printed after approval, with no in-person visit.
Is classification mandatory for government projects?
Yes, for projects subject to classification: Article 3 of the Contractor Classification Law bars government entities from accepting a bid without classification in the project's field and grade.
How many contracting companies are in Saudi Arabia?
The Saudi Contractors Authority 2025 report cites about 365k firms at end of 2025 vs 281k in 2024, and about 70k active Authority memberships.
What is the Saudization ratio for engineering professions?
30% in private firms with 5+ workers in engineering professions, applied since 30 June 2026 per the Ministry of Human Resources.
What changed for contractors in the new tenders law?
The new law raises direct purchase to SAR 1m, cuts the delay penalty cap to 15% outside supply, and bars an entity from new awards while dues are unpaid. Its effective date is unverified, so read the text and its regulations.
Is the Saudi contracting market slowing?
Award value fell 48.5% in 2025 per MEED Projects as giga-projects slipped, but the GCC unawarded pipeline reached USD 3.2 trn, and the number of firms is rising.
You may also like
Related businesses
- Manufacturing, Packaging & Industrial SupplySector guide
- Energy & MiningSector guide
- Real Estate Development, Brokerage & Property ManagementFeasibility study
- Government Entities, Municipalities & Vision ProgramsMarketing guide
- State-owned & PIF CompaniesMarketing guide
- Marketplaces & Delivery AppsFeasibility study
Takteek services for this business
Sources (17)
Figures come from the latest official, press and research publications available when the guide was prepared. Check with the relevant authority before any legal or financial decision.
- Saudi Contractors Authority: 365,000 firms and 4.4 million workers at end-2025 (in Arabic) · Okaz (Saudi Contractors Authority) (2026-07)
- Up 8.9%: 4 million workers in Saudi contracting in 2025 (in Arabic) · Alyaum (Saudi Contractors Authority) (2026-07)
- Contract awards fell by nearly half in 2025 on gigaproject delays (MEED Projects) · Enterprise AM (2026-01)
- Ministry of Municipalities launches updated contractor classification on Balady (in Arabic) · Sabq (2026-06)
- Contractor Classification Law (M/9 of 1443H, as amended) (in Arabic) · Qanoniah (2025-09)
- 291,000 accredited engineers in Saudi Arabia (in Arabic) · Al Eqtisadiah (2025-03)
- Engineering offices and firms in the Kingdom (in Arabic) · Al Watan (2025-10)
- Higher Saudization rate in engineering jobs applied (in Arabic) · Ministry of Human Resources and Social Development (2026-06)
- Saudi Building Code Enforcement Law (in Arabic) · Ministry of Municipalities and Housing (2025-10)
- Key points of the amended Saudi Building Code violations regulation (in Arabic) · Ajel (2021-10)
- New procurement law: direct purchase ceiling raised to one million (in Arabic) · Okaz (2026-09)
- Main amendments to the Government Tenders and Procurement Law 1448H (in Arabic) · Okaz (2026-08)
- LCGPA: SAR 336.3B tenders launched via Etimad in 2024 · Argaam (2025-07)
- Saudi cement sales (2024–2025) · Amlak (2025-11)
- Half of contracting firms late paying workers' wages (in Arabic) · Al Madina (2018-07)
- Ministry of Finance: new Government Tenders and Procurement Law approved (in Arabic) · Ministry of Finance (2026-08)
- Regulation on preference for local content and local SMEs (in Arabic) · Qanoniah / LCGPA (2020)
Talk to Takteek
Does your business qualify for a free consultation?
Answer four short steps about your business and budget. Our team reviews your answers and comes back with a first plan built on your numbers.
- A plan built on your numbers
- One team for ads, content and store
- Free consultation, no commitment