Skip to content

Sector guide: Manufacturing, Packaging & Industrial Supply

The factory is ready, so who buys? Local content may open the door

Factories keep multiplying, and products on the mandatory list are bought nationally. The winner proves its local content and reaches buyers early.

  • 12946 factoriesOperating and under-construction factories
  • 1660 licensesNew industrial licenses, 2025
  • 965 productsWith a local content minimum
  • 14.81 bn USDPlastic packaging market estimate

In short

The one-minute summary

  • 1,660 new industrial licenses in 2025 across all sectors, and the number of packaging competitors is unknown. Count them in your category.
  • The local content certificate counts in government tender evaluation today, and becomes a condition for using the mandatory list from June 2028.
  • The obligation covers only products on the list. Others get a price preference and evaluation weight.
  • Cheap imports are the biggest threat to small factories. MIM opened a service to report harmful competition.
  • Selling to large buyers means long registration and prequalification. Start before your line is complete.

Numbers

Manufacturing, Packaging & Industrial Supply in numbers

12946 factoriesTotal factories, end of 202510,394 producing and 2,552 under construction2025
1660 licensesNew industrial licensesWith investment above 76 bn SAR2025
1201 factoriesFactories that started productionWith investment above 31 bn SAR2025
45454 workersWorkforce at newly producing factoriesApprox.; for factories that started production in 20252025
7739 facilitiesIndustrial facilities in MODONIncluding 1,122 new facilities in 20252025
470 bn SARCumulative private investment in MODON2025

All the numbers (12)

3700 companiesCompanies in Made in SaudiOver 19k products carry the logo2025
965 productsProducts with a local content minimumIn 14 sectors, applies from June 20282026
336.3 bn SARGovernment tenders via EtimadAll sectors; local content counts in evaluation2024
180 bn SARSIDF cumulative loansApprox.; to over 4,000 projects since founding2025
3.3 bn USDPaper packaging marketResearch estimate; expected growth 4.14% a year to 2034; a different firm2025
14.81 bn USDPlastic packaging marketResearch estimate; expected growth 5.62% a year; a different firm from the paper figure2025

Opportunities

Where the openings are now

  • National product protection in procurement

    The mandatory list and local content minimum for 965 products open protected government demand for qualified factories.

  • Government spending via Etimad

    336.3 bn SAR in tenders issued in 2024, with local content counted in evaluation.

  • Packaging market is growing

    Two research estimates from different firms: plastic packaging about 14.81 bn USD and paper 3.3 bn in 2025, so do not compare them directly. E-commerce lifts carton demand.

  • New factories need suppliers

    1,201 factories started production in 2025; many need packaging, parts and operating supplies.

  • Ready industrial cities

    MODON delivered 17.6 m m² of developed land in 2025, cutting factory setup time.

  • Exporting under a national brand

    Made in Saudi includes 3,700 companies with products reaching about 180 countries.

Deal path

How this sector buys

  1. 01

    Supplier registration

    Register on Etimad for government entities, and on each large company's vendor portal.

  2. 02

    Prequalification and inspection

    Factory, certificate and sample audit, possibly with a site visit before the first order.

  3. 03

    Local content certificate

    Required in tenders; affects financial evaluation and mandatory list benefits.

  4. 04

    RFQ or tender

    Technical specs, quantities and a delivery schedule; technical then financial evaluation.

  5. 05

    Framework agreement

    A price for a year or more with repeat purchase orders as needed.

  6. 06

    Receipt, inspection, then payment

    Payment after receipt and conformity; penalties for delay or defects per the contract.

Before you invest

What worries you before you start?

Questions everyone considering this business asks, with short answers.

Chinese importers sell below my cost

MIM opened a "harmful competition report" service for dumped or sudden import surges. Document prices and volumes and file the report, and focus on what importers cannot offer: fast supply and customization.

I will build the factory and find no large buyer

1,201 factories started production in 2025 and many need packaging. Large buyers qualify suppliers through their portals, so register and submit samples during construction.

1201factories started production 2025, potential buyers

I do not know how to benefit from local content

A product on the mandatory list is bought nationally in government tenders. First check whether your product is on the list (965 products in 14 sectors). From June 2028 you must meet the local content minimum in the certificate to benefit.

965Products with a local content minimum

Industrial licensing is long and complex

Apply through the Industrial platform: a preliminary license, then an inspection visit and a final license. Prepare the CR, feasibility study and site before applying. Confirm current timelines and fees with MIM.

Large buyers pay a long time after delivery

Payment after delivery and conformity is usual in large contracts. Plan working capital for a full cycle. Split financing between SIDF and banks, and check terms for small firms directly.

180bn SAR cumulative SIDF loans (total)

So many new factories will spark a price war

New licenses (1,660 in 2025 across all sectors) do not mean a price war in every category, but cheap imports compete on large standard volumes. So pick a niche: certified food packaging, high-end printing, or fast small runs for online stores.

1660new industrial licenses 2025, all sectors

My product is not registered on SABER. Am I barred from selling?

Local and imported consumer products register on SABER and need a conformity certificate or self-declaration, depending on their regulation. Find out early whether your packaging falls under a technical regulation. A missing required certificate stops sales.

160000conformity certificates (period needs checking)

Delay penalties in supply contracts are harsh

News about the new tendering law points to a 15% cap on late-delivery penalties that does not cover supply contracts. Confirm the final text, read the penalty clause in every contract, and do not commit to a date your capacity and materials cannot guarantee.

Costs many people forget

  • Conformity certificates and testingRepeats with every product or changePer product and technical regulation
  • Local content certificateRequired to benefit from the mandatory listPeriodic audit
  • Working capital for credit termsLarge buyers pay after receiptA full payment cycle
  • Raw material price swingsFixed-price annual contracts absorb the differenceImported polymers and paper
  • Samples and trials for buyersSamples and design changes, usually freeBefore any purchase order
  • Safety stockBuyers require guaranteed availabilityPer the supply agreement

Feasibility calculator

When do you get your capital back?

Enter your numbers and the tool projects payback and profit over 36 months in three scenarios.

%
%
%

Move the slider or type a number. Results update instantly; the figures shown now use the default values.

Payback month
Over 36
Net profit, month 12 (SAR)
-4,621
Year-one sales (SAR)
7,958,563
Minimum acceptable ROAS
5.6x

On these numbers your capital does not come back within 36 months. You need about 2 contract a month to cover fixed costs. Adjust the numbers to your case.

Year-one sales in three scenarios

  • Cautious5,570,994 · over 36
  • Expected7,958,563 · over 36
  • Optimistic10,346,132 · over 36

Assumptions for a small factory signing one supply contract a month. The 5,000,000 capital is an assumption with no published basis. Not market figures; enter your prices and line costs.

Rules

Licences and rules before you sell

Rules and decisions (6)

  • 2026

    Mandatory list of national products

    Products government entities must buy national, and from June 2028 with a local content minimum per product.

  • 2020

    National product and small firm preference

    A price preference for national products and local small firms, and weight for local content in financial evaluation.

  • 2024

    Industrial license

    A preliminary license for construction, then final after inspection. Operating without a license risks fines and closure.

    Check with the official authority before acting
  • 2024

    Product registration on SABER

    Local and imported consumer products need registration and a technical regulation conformity certificate before sale.

  • 2025

    Harmful competition report

    A MIM service to report dumping and sudden import surges under WTO commitments.

  • 2026

    Delay penalties in the new law

    The cut of the delay penalty cap to 15% does not cover supply contracts. Read the clause in every contract.

    Check with the official authority before acting

Licences (6)

  • Ministry of Commerce

    CR with an industrial activity

    Required before applying for an industrial license

    Check with the official authority before acting
  • Ministry of Industry and Mineral Resources (MIM, Industrial platform)

    Industrial license

    Preliminary for construction, then final after the inspection visit

    Check with the official authority before acting
  • Saudi Authority for Industrial Cities and Technology Zones (MODON)

    Industrial land lease

    Developed land or a ready-built factory inside industrial cities

    Check with the official authority before acting
  • SASO (SABER platform)

    Product registration and conformity certificate

    Local product registration and a conformity certificate or self-declaration

  • Local Content and Government Procurement Authority (LCGPA)

    Local content certificate

    Proves your local content share, required for the mandatory list

  • Made in Saudi program

    Made in Saudi logo

    Register the company and products to use the logo in marketing and export

    Check with the official authority before acting

Entry requirements for suppliers (5)

  • Final industrial license

    Proves you are a real factory, not a distributor; buyers ask for it in prequalification

    Check with the official authority before acting
  • Local content certificate

    A documented share per LCGPA methodology, required for the mandatory list from 2028

  • Conformity certificate

    Product registered on SABER and compliant with its technical regulation

  • Made in Saudi membership

    Company and product registration to use the national logo

  • Etimad registration

    To view and bid on government tenders

Seasons

When to sell, when to prepare

  1. High

    December–January

    Budgets approved and annual supply contracts renewed

    Start 8 weeks beforeRenew the local content certificate and buyer registrations

  2. Peak

    Before Ramadan

    Peak demand for food packaging, gift boxes and dates

    Start 10 weeks beforeStock raw materials and print seasonal designs early

  3. High

    Before Dhu al-Hijjah

    Packaging demand for Hajj meals and catering

    Start 10 weeks beforeAgreements with caterers and hotels

  4. High

    September–November

    Preparing year-end sales and e-commerce seasons

    Start 8 weeks beforeShipping carton offers for online stores

  5. High

    December

    Made in Saudi Expo and buyer meetings

    Start 8 weeks beforeSamples, catalog and pre-booked meetings with procurement

  6. Quiet

    June–August

    Purchase decisions slow during summer holidays

    Start 4 weeks beforeLine maintenance and certificate renewals

Regions

Where demand concentrates in the Kingdom

Eastern: 15.5%Najran: 0.6%Northern Borders: 0.5%Hail: 1.6%Riyadh: 44.7%Asir: 3.4%Makkah: 22.4%Tabuk: 1.8%Madinah: 4.5%Qassim: 2.8%Al Bahah: 0.2%Jazan: 1.6%Al Jawf: 0.7%

Share of delivery orders (%)Lower ← → Higher

Regions worth starting in

  1. 1RiyadhHome to government and large-company headquarters. A regional factory-count metric is not available here.26.7% of population
  2. 2MakkahClose to Jeddah Port and Jeddah Industrial City.24.9% of population
  3. 3EasternJubail and Dammam: petrochemicals, plastic inputs and large industrial buyers.15.9% of population
  4. 4QassimFood and agricultural industries that need packaging near the farms.4.2% of population

Indicators for all 13 regions

RegionPopulation (2022)Of populationOf delivery ordersOf commercial registers
Riyadh8,591,74826.7%44.7%34.7%
Makkah8,021,46324.9%22.4%20.7%
Eastern5,125,25415.9%15.5%15.7%
Madinah2,137,9836.6%4.5%4.9%
Asir2,024,2856.3%3.4%5%
Jazan1,404,9974.4%1.6%–
Qassim1,336,1794.2%2.8%5.3%
Tabuk886,0362.8%1.8%–
Hail746,4062.3%1.6%–
Al Jawf595,8221.9%0.7%–
Najran592,3001.8%0.6%–
Northern Borders373,5771.2%0.5%–
Al Bahah339,1741.1%0.2%–

Population from the 2022 GASTAT census, delivery orders from the Transport General Authority for Q1 2025, registers from the Ministry of Commerce bulletin for Q2 2026.

Model and competition

Which shape fits you, and who do you compete with?

Possible business models

Specialized packaging factory

Fits: Serving a clear segment: food, pharma or e-commerce

Pros

  • Repeat demand
  • Annual contracts

Challenges

  • Sensitive to raw material prices
  • Food safety requirements

Capital: High: production and printing lines

Small short-run factory

Fits: Printing and customization in small runs for stores and restaurants

Pros

  • Higher margin
  • Many clients

Challenges

  • Constant sales and marketing
  • Small orders

Capital: Medium: digital machines

Industrial supplier (distribution)

Fits: Agent or distributor of parts and supplies for factories and projects

Pros

  • Faster entry
  • Less capital than a factory

Challenges

  • Lower local content
  • Long credit terms

Capital: Medium: inventory and credit

Factory for a mandatory-list product

Fits: Making a product government entities must buy national

Pros

  • Protected demand
  • Preference in tenders

Challenges

  • Local content audits
  • Long prequalification

Capital: High

Who you compete with

TypeExamplesNote
Large industrial groupsLarge national industrial groups in paper, plastic and glassMay have production capacity and long contracts with major buyers
Low-priced importsPackaging and supplies from AsiaCompete on price for large standard volumes
New small and mid-size factories1,660 new industrial licenses in 2025 across all sectorsSome may enter your category. Count competitors in your own category
Distributors and agentsIndustrial suppliers in Riyadh, Dammam and JeddahOwn the buyer relationships and stock

Where a newcomer can win

  • Fast supply and flexible volumes importers cannot offer
  • A documented local content share that raises your tender rank
  • Food safety and quality certificates large buyers require
  • Custom design and printing for local brands and stores

Sales plan

Your first 90 days of selling

  1. Setup

    Weeks 1–4

    • Final licence comes first. Start conformity and the local content certificate during construction
    • Register on Etimad and 10 buyers' portals, with registration overlapping weeks 5–8
    • Prepare a catalog with capacity and specs
    • Pick one client segment to start
  2. Launch

    Weeks 5–8

    • Send samples to ten target buyers
    • Bid on tenders within your capacity
    • Launch a products page with a clear minimum order
    • Reach procurement via LinkedIn
  3. Growth

    Weeks 9–13

    • Turn the first order into a framework agreement
    • Measure supply quality and on-time delivery
    • Ask your first large client for a referral
    • Plan next season's capacity

Channels and the role of each (6)

ChannelRoleWhyCommon mistake
Etimad and vendor portalsDemand captureGovernment and large company requests are posted thereIncomplete registration that fails you in prequalification
Industrial sales repDemand creationProcurement managers buy from suppliers they know and trustVisits with no samples or certificates
LinkedInDemand creationReach procurement and quality managers by nameGeneric posts with no production capabilities
Made in Saudi Expo and trade showsDemand creationMeet buyers and distributors in one placeA booth with no pre-booked meetings
Google search and a digital catalogDemand captureStores and restaurants search for a nearby packaging factoryA site with no minimum order or prices
Key accountsLoyaltyA satisfied large client renews every yearNo account manager or quality follow-up

The KPIs to track (5)

KPIFormulaWhat to watch
Bid win rateBids accepted ÷ bids submittedA decline signals price or prequalification gaps
On-time deliveryOrders on time ÷ all ordersThe first thing large buyers track
Capacity utilizationActual output ÷ available capacityIdle capacity is fixed cost with no return
Days to collectAverage days to payment after invoiceSets your financing needs
Local content ratioPer LCGPA methodologyRaises your rank in tenders

SWOT

SWOT for this business in Saudi Arabia

SStrengths

  • Government support for national products
  • Developed industrial cities and industrial financing
  • Close to petrochemical feedstock for plastic packaging

WWeaknesses

  • Reliance on imported paper and equipment
  • Small factories with weak marketing
  • Long buyer prequalification

OOpportunities

  • Mandatory list and local content minimum
  • E-commerce growth and shipping packaging
  • New factories need local suppliers

TThreats

  • Low-priced imports and dumping
  • Raw material price swings
  • More new local competitors

Ad ideas

Ad lines to start with

  • Packaging made in Saudi Arabia, delivered in days, not weeks

  • Print your box with your logo, starting from a small run

  • A local supplier that raises your local content in tenders

From the market

Practical tips for this business

  1. Start prequalification with buyers while building the factory, not after it runs.
  2. Calculate your local content share early and pick local suppliers that raise it.
  3. Pick one segment and get its certificates before expanding to others.
  4. Offer a low minimum order to small stores. They are tomorrow's large clients.
  5. Document every sign of dumping and report it to MIM instead of staying silent.

Free files

Ready files for your project

Each file downloads on its own in Takteek branding, with this guide’s data and your calculator numbers, and a copy reaches your inbox.

  • XLSX

    Feasibility worksheet

    36 months of revenue and costs, three scenarios and live formulas, with your calculator numbers.

  • XLSX

    Pricing and break-even calculator

    Price after fees, shipping and commissions, and the maximum cost per order.

  • DOCX

    SWOT analysis

    A ready analysis with room for your own points.

  • DOCX

    Marketing plan

    Goals, channels, seasons, budget and KPIs.

  • DOCX

    Marketing strategy

    Audience, positioning, messages and channel mix.

  • XLSX

    90-day plan tracker

    Tasks by week with owner and status.

  • XLSX

    Competitor analysis

    A comparison sheet ready to fill.

  • XLSX

    Season calendar

    Seasons and when to prepare for each.

  • PDF

    Licences and rules checklist

    A list to check before launch.

  • XLSX

    Large buyer prequalification plan

    One qualified buyer beats ten calls. Update the table weekly.

Questions owners ask

How do I get an industrial license in Saudi Arabia?

Through MIM's Industrial platform: a CR with an industrial activity and a feasibility study, then a preliminary license for construction, then an inspection visit and a final license. Check current fees and timelines with MIM.

How many factories are in Saudi Arabia?

12,946 factories at end of 2025: 10,394 producing and 2,552 under construction, per the Ministry of Industry and Mineral Resources.

What is the local content mandatory list?

A list of national products government entities must buy locally. LCGPA announced a local content minimum for 965 products in 14 sectors, applying from June 2028.

How do I register my product in Made in Saudi?

Register in the program and add the company and its products to use the logo. The program includes over 3,700 companies and 19k products as of December 2025.

Does SIDF finance small factories?

We found no published terms for small firms. SIDF has approved about 180 bn SAR in loans for over 4,000 projects since founding. Check financing share and collateral with SIDF directly.

How big is the packaging market in Saudi Arabia?

Research estimates from two different firms: about 14.81 bn USD for plastic packaging and 3.3 bn for paper packaging in 2025, so do not compare them directly. Expected annual growth is 4% to 6%.

Sources (18)

Figures come from the latest official, press and research publications available when the guide was prepared. Check with the relevant authority before any legal or financial decision.

  1. 12,946 factories at end-2025 (in Arabic) · Okaz (Ministry of Industry and Mineral Resources) (2026-05)
  2. Saudi Arabia's Industrial and Mining Sectors Record Strong Growth in 2025 · Asharq Al-Awsat (MIM) (2026-03)
  3. Saudi Arabia issues 168 new industrial licenses in December 2025 · Argaam (2026-01)
  4. MODON: 1,122 new facilities and SAR 470 billion investment in 2025 (in Arabic) · Al Watan (2026-06)
  5. MODON: SAR 440 billion investment in industrial cities in 2024 (in Arabic) · Al Watan (2025-05)
  6. Third Made in Saudi exhibition opens (in Arabic) · Okaz (2025-12)
  7. Minimum local content for 965 products on the mandatory list (in Arabic) · Okaz (2026-07)
  8. Saudi Arabia widens minimum local content requirements (in Arabic) · Asharq Al-Awsat (2026-07)
  9. LCGPA: SAR 336.3B tenders launched via Etimad in 2024 · Argaam (2025-07)
  10. Regulation on preference for local content and local SMEs (in Arabic) · Qanoniah / LCGPA (2020)
  11. SIDF: SAR 180 billion in approved loans (in Arabic) · Al Watan (2025-06)
  12. Saudi Arabia Paper Packaging Market · IMARC Group (2026)
  13. Saudi Arabia Plastic Packaging Market Report · Grand View Research (2026)
  14. Ministry of Industry urges factories to report harmful competition (in Arabic) · Okaz (2025-07)
  15. SABER: over 800,000 registered products and 160,000 conformity certificates (in Arabic) · Okaz (SASO) (2024-07)
  16. Saudi Industrial Regulation and Licensing Law (in Arabic) · Adel (legal blog) (2025)
  17. Surge in Saudi industrial licenses (April 2024 bulletin) · Daleel (Ministry of Industry) (2024-05)
  18. New procurement law: direct purchase ceiling raised to one million (in Arabic) · Okaz (2026-09)

Talk to Takteek

Does your business qualify for a free consultation?

Answer four short steps about your business and budget. Our team reviews your answers and comes back with a first plan built on your numbers.

  • A plan built on your numbers
  • One team for ads, content and store
  • Free consultation, no commitment
Message us on WhatsApp
Tell us about your business
What do you want to achieve?

Approximate monthly ad budget

Pick at least one option, then your approximate budget.

How can we reach you?
+966
You are
Review your request

The consultation is free, with no commitment.

Free download

Get the file

We send the file to your e-mail. Please use an address you read.

+1
You are
Free consultation×