Sector guide: Manufacturing, Packaging & Industrial Supply
The factory is ready, so who buys? Local content may open the door
Factories keep multiplying, and products on the mandatory list are bought nationally. The winner proves its local content and reaches buyers early.
- 12946 factoriesOperating and under-construction factories
- 1660 licensesNew industrial licenses, 2025
- 965 productsWith a local content minimum
- 14.81 bn USDPlastic packaging market estimate
In short
The one-minute summary
- 1,660 new industrial licenses in 2025 across all sectors, and the number of packaging competitors is unknown. Count them in your category.
- The local content certificate counts in government tender evaluation today, and becomes a condition for using the mandatory list from June 2028.
- The obligation covers only products on the list. Others get a price preference and evaluation weight.
- Cheap imports are the biggest threat to small factories. MIM opened a service to report harmful competition.
- Selling to large buyers means long registration and prequalification. Start before your line is complete.
Numbers
Manufacturing, Packaging & Industrial Supply in numbers
All the numbers (12)
Opportunities
Where the openings are now
National product protection in procurement
The mandatory list and local content minimum for 965 products open protected government demand for qualified factories.
Government spending via Etimad
336.3 bn SAR in tenders issued in 2024, with local content counted in evaluation.
Packaging market is growing
Two research estimates from different firms: plastic packaging about 14.81 bn USD and paper 3.3 bn in 2025, so do not compare them directly. E-commerce lifts carton demand.
New factories need suppliers
1,201 factories started production in 2025; many need packaging, parts and operating supplies.
Ready industrial cities
MODON delivered 17.6 m m² of developed land in 2025, cutting factory setup time.
Exporting under a national brand
Made in Saudi includes 3,700 companies with products reaching about 180 countries.
Deal path
How this sector buys
- 01
Supplier registration
Register on Etimad for government entities, and on each large company's vendor portal.
- 02
Prequalification and inspection
Factory, certificate and sample audit, possibly with a site visit before the first order.
- 03
Local content certificate
Required in tenders; affects financial evaluation and mandatory list benefits.
- 04
RFQ or tender
Technical specs, quantities and a delivery schedule; technical then financial evaluation.
- 05
Framework agreement
A price for a year or more with repeat purchase orders as needed.
- 06
Receipt, inspection, then payment
Payment after receipt and conformity; penalties for delay or defects per the contract.
Before you invest
What worries you before you start?
Questions everyone considering this business asks, with short answers.
Chinese importers sell below my cost
MIM opened a "harmful competition report" service for dumped or sudden import surges. Document prices and volumes and file the report, and focus on what importers cannot offer: fast supply and customization.
I will build the factory and find no large buyer
1,201 factories started production in 2025 and many need packaging. Large buyers qualify suppliers through their portals, so register and submit samples during construction.
1201factories started production 2025, potential buyers
I do not know how to benefit from local content
A product on the mandatory list is bought nationally in government tenders. First check whether your product is on the list (965 products in 14 sectors). From June 2028 you must meet the local content minimum in the certificate to benefit.
965Products with a local content minimum
Industrial licensing is long and complex
Apply through the Industrial platform: a preliminary license, then an inspection visit and a final license. Prepare the CR, feasibility study and site before applying. Confirm current timelines and fees with MIM.
Large buyers pay a long time after delivery
Payment after delivery and conformity is usual in large contracts. Plan working capital for a full cycle. Split financing between SIDF and banks, and check terms for small firms directly.
180bn SAR cumulative SIDF loans (total)
So many new factories will spark a price war
New licenses (1,660 in 2025 across all sectors) do not mean a price war in every category, but cheap imports compete on large standard volumes. So pick a niche: certified food packaging, high-end printing, or fast small runs for online stores.
1660new industrial licenses 2025, all sectors
My product is not registered on SABER. Am I barred from selling?
Local and imported consumer products register on SABER and need a conformity certificate or self-declaration, depending on their regulation. Find out early whether your packaging falls under a technical regulation. A missing required certificate stops sales.
160000conformity certificates (period needs checking)
Delay penalties in supply contracts are harsh
News about the new tendering law points to a 15% cap on late-delivery penalties that does not cover supply contracts. Confirm the final text, read the penalty clause in every contract, and do not commit to a date your capacity and materials cannot guarantee.
Costs many people forget
- Conformity certificates and testingRepeats with every product or changePer product and technical regulation
- Local content certificateRequired to benefit from the mandatory listPeriodic audit
- Working capital for credit termsLarge buyers pay after receiptA full payment cycle
- Raw material price swingsFixed-price annual contracts absorb the differenceImported polymers and paper
- Samples and trials for buyersSamples and design changes, usually freeBefore any purchase order
- Safety stockBuyers require guaranteed availabilityPer the supply agreement
Feasibility calculator
When do you get your capital back?
Enter your numbers and the tool projects payback and profit over 36 months in three scenarios.
- Payback month
- Over 36
- Net profit, month 12 (SAR)
- -4,621
- Year-one sales (SAR)
- 7,958,563
- Minimum acceptable ROAS
- 5.6x
On these numbers your capital does not come back within 36 months. You need about 2 contract a month to cover fixed costs. Adjust the numbers to your case.
Year-one sales in three scenarios
- Cautious5,570,994 · over 36
- Expected7,958,563 · over 36
- Optimistic10,346,132 · over 36
Assumptions for a small factory signing one supply contract a month. The 5,000,000 capital is an assumption with no published basis. Not market figures; enter your prices and line costs.
Rules
Licences and rules before you sell
Rules and decisions (6)
- 2026
Mandatory list of national products
Products government entities must buy national, and from June 2028 with a local content minimum per product.
- 2020
National product and small firm preference
A price preference for national products and local small firms, and weight for local content in financial evaluation.
- 2024
Industrial license
A preliminary license for construction, then final after inspection. Operating without a license risks fines and closure.
Check with the official authority before acting - 2024
Product registration on SABER
Local and imported consumer products need registration and a technical regulation conformity certificate before sale.
- 2025
Harmful competition report
A MIM service to report dumping and sudden import surges under WTO commitments.
- 2026
Delay penalties in the new law
The cut of the delay penalty cap to 15% does not cover supply contracts. Read the clause in every contract.
Check with the official authority before acting
Licences (6)
- Ministry of Commerce
CR with an industrial activity
Required before applying for an industrial license
Check with the official authority before acting - Ministry of Industry and Mineral Resources (MIM, Industrial platform)
Industrial license
Preliminary for construction, then final after the inspection visit
Check with the official authority before acting - Saudi Authority for Industrial Cities and Technology Zones (MODON)
Industrial land lease
Developed land or a ready-built factory inside industrial cities
Check with the official authority before acting - SASO (SABER platform)
Product registration and conformity certificate
Local product registration and a conformity certificate or self-declaration
- Local Content and Government Procurement Authority (LCGPA)
Local content certificate
Proves your local content share, required for the mandatory list
- Made in Saudi program
Made in Saudi logo
Register the company and products to use the logo in marketing and export
Check with the official authority before acting
Entry requirements for suppliers (5)
Final industrial license
Proves you are a real factory, not a distributor; buyers ask for it in prequalification
Check with the official authority before actingLocal content certificate
A documented share per LCGPA methodology, required for the mandatory list from 2028
Conformity certificate
Product registered on SABER and compliant with its technical regulation
Made in Saudi membership
Company and product registration to use the national logo
Etimad registration
To view and bid on government tenders
Seasons
When to sell, when to prepare
- High
December–January
Budgets approved and annual supply contracts renewed
Start 8 weeks beforeRenew the local content certificate and buyer registrations
- Peak
Before Ramadan
Peak demand for food packaging, gift boxes and dates
Start 10 weeks beforeStock raw materials and print seasonal designs early
- High
Before Dhu al-Hijjah
Packaging demand for Hajj meals and catering
Start 10 weeks beforeAgreements with caterers and hotels
- High
September–November
Preparing year-end sales and e-commerce seasons
Start 8 weeks beforeShipping carton offers for online stores
- High
December
Made in Saudi Expo and buyer meetings
Start 8 weeks beforeSamples, catalog and pre-booked meetings with procurement
- Quiet
June–August
Purchase decisions slow during summer holidays
Start 4 weeks beforeLine maintenance and certificate renewals
Regions
Where demand concentrates in the Kingdom
Share of delivery orders (%)Lower ← → Higher
Regions worth starting in
- 1RiyadhHome to government and large-company headquarters. A regional factory-count metric is not available here.26.7% of population
- 2MakkahClose to Jeddah Port and Jeddah Industrial City.24.9% of population
- 3EasternJubail and Dammam: petrochemicals, plastic inputs and large industrial buyers.15.9% of population
- 4QassimFood and agricultural industries that need packaging near the farms.4.2% of population
Indicators for all 13 regions
| Region | Population (2022) | Of population | Of delivery orders | Of commercial registers |
|---|---|---|---|---|
| Riyadh | 8,591,748 | 26.7% | 44.7% | 34.7% |
| Makkah | 8,021,463 | 24.9% | 22.4% | 20.7% |
| Eastern | 5,125,254 | 15.9% | 15.5% | 15.7% |
| Madinah | 2,137,983 | 6.6% | 4.5% | 4.9% |
| Asir | 2,024,285 | 6.3% | 3.4% | 5% |
| Jazan | 1,404,997 | 4.4% | 1.6% | – |
| Qassim | 1,336,179 | 4.2% | 2.8% | 5.3% |
| Tabuk | 886,036 | 2.8% | 1.8% | – |
| Hail | 746,406 | 2.3% | 1.6% | – |
| Al Jawf | 595,822 | 1.9% | 0.7% | – |
| Najran | 592,300 | 1.8% | 0.6% | – |
| Northern Borders | 373,577 | 1.2% | 0.5% | – |
| Al Bahah | 339,174 | 1.1% | 0.2% | – |
Population from the 2022 GASTAT census, delivery orders from the Transport General Authority for Q1 2025, registers from the Ministry of Commerce bulletin for Q2 2026.
Model and competition
Which shape fits you, and who do you compete with?
Possible business models
Specialized packaging factory
Fits: Serving a clear segment: food, pharma or e-commerce
Pros
- Repeat demand
- Annual contracts
Challenges
- Sensitive to raw material prices
- Food safety requirements
Capital: High: production and printing lines
Small short-run factory
Fits: Printing and customization in small runs for stores and restaurants
Pros
- Higher margin
- Many clients
Challenges
- Constant sales and marketing
- Small orders
Capital: Medium: digital machines
Industrial supplier (distribution)
Fits: Agent or distributor of parts and supplies for factories and projects
Pros
- Faster entry
- Less capital than a factory
Challenges
- Lower local content
- Long credit terms
Capital: Medium: inventory and credit
Factory for a mandatory-list product
Fits: Making a product government entities must buy national
Pros
- Protected demand
- Preference in tenders
Challenges
- Local content audits
- Long prequalification
Capital: High
Who you compete with
| Type | Examples | Note |
|---|---|---|
| Large industrial groups | Large national industrial groups in paper, plastic and glass | May have production capacity and long contracts with major buyers |
| Low-priced imports | Packaging and supplies from Asia | Compete on price for large standard volumes |
| New small and mid-size factories | 1,660 new industrial licenses in 2025 across all sectors | Some may enter your category. Count competitors in your own category |
| Distributors and agents | Industrial suppliers in Riyadh, Dammam and Jeddah | Own the buyer relationships and stock |
Where a newcomer can win
- Fast supply and flexible volumes importers cannot offer
- A documented local content share that raises your tender rank
- Food safety and quality certificates large buyers require
- Custom design and printing for local brands and stores
Sales plan
Your first 90 days of selling
Setup
Weeks 1–4
- Final licence comes first. Start conformity and the local content certificate during construction
- Register on Etimad and 10 buyers' portals, with registration overlapping weeks 5–8
- Prepare a catalog with capacity and specs
- Pick one client segment to start
Launch
Weeks 5–8
- Send samples to ten target buyers
- Bid on tenders within your capacity
- Launch a products page with a clear minimum order
- Reach procurement via LinkedIn
Growth
Weeks 9–13
- Turn the first order into a framework agreement
- Measure supply quality and on-time delivery
- Ask your first large client for a referral
- Plan next season's capacity
Channels and the role of each (6)
| Channel | Role | Why | Common mistake |
|---|---|---|---|
| Etimad and vendor portals | Demand capture | Government and large company requests are posted there | Incomplete registration that fails you in prequalification |
| Industrial sales rep | Demand creation | Procurement managers buy from suppliers they know and trust | Visits with no samples or certificates |
| Demand creation | Reach procurement and quality managers by name | Generic posts with no production capabilities | |
| Made in Saudi Expo and trade shows | Demand creation | Meet buyers and distributors in one place | A booth with no pre-booked meetings |
| Google search and a digital catalog | Demand capture | Stores and restaurants search for a nearby packaging factory | A site with no minimum order or prices |
| Key accounts | Loyalty | A satisfied large client renews every year | No account manager or quality follow-up |
The KPIs to track (5)
| KPI | Formula | What to watch |
|---|---|---|
| Bid win rate | Bids accepted ÷ bids submitted | A decline signals price or prequalification gaps |
| On-time delivery | Orders on time ÷ all orders | The first thing large buyers track |
| Capacity utilization | Actual output ÷ available capacity | Idle capacity is fixed cost with no return |
| Days to collect | Average days to payment after invoice | Sets your financing needs |
| Local content ratio | Per LCGPA methodology | Raises your rank in tenders |
SWOT
SWOT for this business in Saudi Arabia
SStrengths
- Government support for national products
- Developed industrial cities and industrial financing
- Close to petrochemical feedstock for plastic packaging
WWeaknesses
- Reliance on imported paper and equipment
- Small factories with weak marketing
- Long buyer prequalification
OOpportunities
- Mandatory list and local content minimum
- E-commerce growth and shipping packaging
- New factories need local suppliers
TThreats
- Low-priced imports and dumping
- Raw material price swings
- More new local competitors
Ad ideas
Ad lines to start with
Packaging made in Saudi Arabia, delivered in days, not weeks
Print your box with your logo, starting from a small run
A local supplier that raises your local content in tenders
From the market
Practical tips for this business
- Start prequalification with buyers while building the factory, not after it runs.
- Calculate your local content share early and pick local suppliers that raise it.
- Pick one segment and get its certificates before expanding to others.
- Offer a low minimum order to small stores. They are tomorrow's large clients.
- Document every sign of dumping and report it to MIM instead of staying silent.
Free files
Ready files for your project
Each file downloads on its own in Takteek branding, with this guide’s data and your calculator numbers, and a copy reaches your inbox.
- XLSX
Feasibility worksheet
36 months of revenue and costs, three scenarios and live formulas, with your calculator numbers.
- XLSX
Pricing and break-even calculator
Price after fees, shipping and commissions, and the maximum cost per order.
- DOCX
SWOT analysis
A ready analysis with room for your own points.
- DOCX
Marketing plan
Goals, channels, seasons, budget and KPIs.
- DOCX
Marketing strategy
Audience, positioning, messages and channel mix.
- XLSX
90-day plan tracker
Tasks by week with owner and status.
- XLSX
Competitor analysis
A comparison sheet ready to fill.
- XLSX
Season calendar
Seasons and when to prepare for each.
- PDF
Licences and rules checklist
A list to check before launch.
- XLSX
Large buyer prequalification plan
One qualified buyer beats ten calls. Update the table weekly.
Questions owners ask
How do I get an industrial license in Saudi Arabia?
Through MIM's Industrial platform: a CR with an industrial activity and a feasibility study, then a preliminary license for construction, then an inspection visit and a final license. Check current fees and timelines with MIM.
How many factories are in Saudi Arabia?
12,946 factories at end of 2025: 10,394 producing and 2,552 under construction, per the Ministry of Industry and Mineral Resources.
What is the local content mandatory list?
A list of national products government entities must buy locally. LCGPA announced a local content minimum for 965 products in 14 sectors, applying from June 2028.
How do I register my product in Made in Saudi?
Register in the program and add the company and its products to use the logo. The program includes over 3,700 companies and 19k products as of December 2025.
Does SIDF finance small factories?
We found no published terms for small firms. SIDF has approved about 180 bn SAR in loans for over 4,000 projects since founding. Check financing share and collateral with SIDF directly.
How big is the packaging market in Saudi Arabia?
Research estimates from two different firms: about 14.81 bn USD for plastic packaging and 3.3 bn for paper packaging in 2025, so do not compare them directly. Expected annual growth is 4% to 6%.
You may also like
Related businesses
Takteek services for this business
Sources (18)
Figures come from the latest official, press and research publications available when the guide was prepared. Check with the relevant authority before any legal or financial decision.
- 12,946 factories at end-2025 (in Arabic) · Okaz (Ministry of Industry and Mineral Resources) (2026-05)
- Saudi Arabia's Industrial and Mining Sectors Record Strong Growth in 2025 · Asharq Al-Awsat (MIM) (2026-03)
- Saudi Arabia issues 168 new industrial licenses in December 2025 · Argaam (2026-01)
- MODON: 1,122 new facilities and SAR 470 billion investment in 2025 (in Arabic) · Al Watan (2026-06)
- MODON: SAR 440 billion investment in industrial cities in 2024 (in Arabic) · Al Watan (2025-05)
- Third Made in Saudi exhibition opens (in Arabic) · Okaz (2025-12)
- Minimum local content for 965 products on the mandatory list (in Arabic) · Okaz (2026-07)
- Saudi Arabia widens minimum local content requirements (in Arabic) · Asharq Al-Awsat (2026-07)
- LCGPA: SAR 336.3B tenders launched via Etimad in 2024 · Argaam (2025-07)
- Regulation on preference for local content and local SMEs (in Arabic) · Qanoniah / LCGPA (2020)
- SIDF: SAR 180 billion in approved loans (in Arabic) · Al Watan (2025-06)
- Saudi Arabia Paper Packaging Market · IMARC Group (2026)
- Saudi Arabia Plastic Packaging Market Report · Grand View Research (2026)
- Ministry of Industry urges factories to report harmful competition (in Arabic) · Okaz (2025-07)
- SABER: over 800,000 registered products and 160,000 conformity certificates (in Arabic) · Okaz (SASO) (2024-07)
- Saudi Industrial Regulation and Licensing Law (in Arabic) · Adel (legal blog) (2025)
- Surge in Saudi industrial licenses (April 2024 bulletin) · Daleel (Ministry of Industry) (2024-05)
- New procurement law: direct purchase ceiling raised to one million (in Arabic) · Okaz (2026-09)
Talk to Takteek
Does your business qualify for a free consultation?
Answer four short steps about your business and budget. Our team reviews your answers and comes back with a first plan built on your numbers.
- A plan built on your numbers
- One team for ads, content and store
- Free consultation, no commitment


